Cordell Group Ltd

Shipment of a Three Phase Separator Training Skid to Oman

Project description

Johnson Partners was appointed by Cordell Group to move a training skid from Middlesbrough to be installed at the National Training Institute in Muscat, Oman.

The 3-Phase Separator Simulation Plant includes specific process and instrument diagram & functional specification support, associated with BP Offshore facilities.


Cordell shipment

Project requirements

Working with the lead design engineer the the skid was shipped as three modules each 5.2m long x 3.04m wide x 2.78m high and loaded onto 1 x 40’ flat rack and 1 x 20’ flatrack.

We advised and guided the client through manufacture in relation to shipping matters to minimise costs relative to manufacturing sizes.

We attended site visits several times during manufacture to agree the optimum method of preparing the modules for shipment.

Johnson Partners took care of all shipping matters including packing, working with specialists to carry out the lashing and securing for safe seafreight shipment.

We then liaised with our agent in Oman to navigate import customs requirement and arrange an on time delivery to site.